Take advantage of pre-sale pricing. Limited availability.

Explore plans and pricing

paevälja

7/1 and 7/2

In the Paevälja 7/1 and 7/2 buildings, the focus is on everyday comfort and light-filled solutions. The character of the buildings is defined by glazed balconies that extend the living space and allow them to be used for most of the year. The architecture is calm and concise, naturally fitting into the overall appearance of the quarter. These buildings offer a balance between practicality and contemporary urban living.

Technical specifications

ENERGY
EFFICIENCY
CLASS

GLAZED BALCONIES,
TRIPLE-GLAZED
PVC WINDOWS

DISTRICT HEATING,
ADJUSTABLE WATER-BASED
UNDERFLOOR HEATING

BUILDING-LEVEL
VENTILATION

paevälja

9

The Paevälja 9 building stands out in the quarter with its distinctive architecture. The solutions here are bolder and more playful, offering variety and architectural expression. The building also includes duplex apartments that create a greater sense of space and suit those looking for something different from the usual. Paevälja 9 is a good example of how distinctive architecture can be created within a unified design language.

Technical specifications

ENERGY
EFFICIENCY
CLASS

TRIPLE-GLAZED
WOODEN WINDOWS

DISTRICT HEATING,
ADJUSTABLE WATER-BASED
UNDERFLOOR HEATING

APARTMENT-LEVEL
VENTILATION

molumba

architects

A distinctive feature of the Paevälja quarter is that both the architecture and the interior design have been created by the same team. The solutions developed by Molumba Arhitektid ensure a logical and cohesive unity between the external appearance of the buildings and their interior spaces. This allows details to connect organically with one another and creates a consistent quality in both facades and interiors. The result is a calm, well-thought-out environment that works both visually and functionally.

On a course toward the future

20th
cent.

FIRST AIRFIELD IN ESTONIA LOCATED ON THE PAEVÄLJA SITE

2023

PAEVÄLJA PST 11 AND LAGELOO 7
WERE COMPLETED

AUTUMN

2025

SALES LAUNCHED FOR
PAEVÄLJA 7/1, 7/2 AND 9

SPRING

2026

CONSTRUCTION BEGINS ON
PAEVÄLJA 7/1, 7/2 AND 9

AUTUMN

2027

CONSTRUCTION OF
PAEVÄLJA 7/1, 7/2 AND 9 IS COMPLETED

Developed by Reaktiiv